Construction of Power Plant to Provide Heat and Electric Power for PuAT Kiev Cardboard and Paper Mill

Facility name:

Kiev Cardboard and Paper Mill

Contract type:

General Contract

Employer:

PaAT Cardboard and Paper Mill

Project period (start – planned finish):

July 2011 - November 2012

The project provides for construction of a power plant with the capacity of 39 MW of electricity and 135 tons of heat steam per hour for PuAT Kiev Cardboard and Paper Mill, located in the town of Obukhov, Kiev oblast.

The project includes:

  • three SGT-400 type gas turbine power plants of Siemens (England) in full factory supply with rated unit power of 12.9 MW;
  • three heat recovery steam generators (HRSG), with a steaming capacity of 45 t/h, which operating on exhaust heat of gas turbine engines.

Electrical part of the project includes the installation of three 110/10 kV power transformers with a capacity of 16 MVA and the construction of a 110 kV closed distribution unit with gas-insulated circuit breakers.

To compensate for the loss of steam and condensate during the operation and to make-up the heating network the water treatment system is provided for.

Centralized and operating control of the power installation will be performed from a central control panel by an automatic control system (ACS).

Switching of the mill to power supply with the introduction of cogeneration technology will enable to improve the reliability of mill power supply, significantly reduce the cost of staple products and ensure their competitiveness in the market.  



Возврат к списку

Our current projects

Construction of Power Plant to Provide Heat and Electric Power for PuAT Kiev Cardboard and Paper Mill

Construction of Sulfuric Acid Production Complex for Crimea TITAN Company

Construction of External Lightning Protection of Chernobyl NPP Object “Shelter” Physical Protection and Access Control System

Extension of service life of Power Unit No.2 Piping Systems at OP Yuzhnoukrainsk NPP

Completion of Computerised Process Control System of Chernobyl NPP Liquid Radwaste Treatment Plant (LRTP CPCS)



 

Pivdenteploenergomontazh, AT
vul. Pushkinska, 27, Kiev
01601, Ukraine
tel: +38 (044) 499-65-55; 499-65-33
fax: +38 (044) 499-65-57
marketing@utem.kiev.ua