<?xml version="1.0" encoding="UTF-8"?><rss version="2.0">
<channel>
<title>EN Current Projects</title>
<link>http://www.utem-group.com</link>
<description></description>
<lastBuildDate>Sun, 05 Sep 2010 01:20:52 +0300</lastBuildDate>
<ttl>60</ttl>
<item>
	<title>Construction of gas-piston cogeneration plant</title>
	<link>http://www.utem-group.com/en/projects/356/</link>
	<description>
&lt;table class=&quot;bordertable&quot; border=&quot;0&quot; cellspacing=&quot;0&quot; bordercolor=&quot;#c0c0c0&quot; cellpadding=&quot;5&quot; width=&quot;97%&quot; align=&quot;center&quot; bodercolorlight=&quot;#C0C0C0&quot;&gt;
  &lt;tbody&gt;
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Object name:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Construction of TPP for the plant &amp;quot;Coca-Cola Beverages Ukraine Ltd.&amp;quot;&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Form of participation:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;General contract&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Client:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;&amp;quot;Contour Global&amp;quot;, USA&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Terms of project implementation 
        &lt;br /&gt;
      (start - planned completion):&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;August 2008  December 2010&lt;/td&gt;&lt;/tr&gt;
  &lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;Project provides for the &amp;quot;turn-key&amp;quot; construction of the gas-piston plant with electric capacity 9MW for combined production of electrical and thermal power, as well as for production of  carbonic gas. &lt;/p&gt;

&lt;p align=&quot;justify&quot;&gt;      Work scope:&lt;/p&gt;

&lt;ul&gt;
  &lt;li align=&quot;justify&quot;&gt;        Excavation works - 4000  m &lt;sup&gt;3&lt;/sup&gt; ; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;        Concrete laying - 1500 m &lt;sup&gt;3&lt;/sup&gt; ; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;        Steel structures manufacturing - 400 tonnes; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;        Equipment and steel erection - 550 tonnes. &lt;/li&gt;
&lt;/ul&gt;

&lt;p align=&quot;justify&quot;&gt;The plant will be constructed to meet the production demands of &amp;quot;Coca-Cola Beverages Ukraine Ltd.&amp;quot; plant. It is expected that plant capacities will cover own needs of the non-alcoholic beverages plant.&lt;/p&gt;

&lt;p align=&quot;justify&quot;&gt;&lt;a href=&quot;/images/tekushie_proekty/Koka-Kola_big.jpg&quot; target=&quot;_blank&quot; &gt;&lt;img title=&quot;Zoom in&quot; border=&quot;0&quot; src=&quot;/images/tekushie_proekty/Koka-Kola_small.jpg&quot; width=&quot;140&quot; height=&quot;105&quot; /&gt;&lt;/a&gt;&lt;/p&gt;
</description>
			<enclosure url="http://www.utem-group.com/upload/iblock/4d2/Koka-Kola_small.jpg" length="5307" type="image/jpeg"/>
				<pubDate>Sun, 05 Sep 2010 01:20:52 +0300</pubDate>
</item>
<item>
	<title>Capital repair of boiler unit and turbine of unit №1 on Kalushskaya TPP</title>
	<link>http://www.utem-group.com/en/projects/359/</link>
	<description>
&lt;p&gt;
  &lt;table border=&quot;0&quot; cellspacing=&quot;0&quot; cellpadding=&quot;0&quot; width=&quot;100%&quot;&gt;
    &lt;tbody&gt;
      &lt;tr&gt;&lt;td style=&quot;TEXT-ALIGN: justify&quot; valign=&quot;top&quot;&gt;
          &lt;table class=&quot;bordertable&quot; border=&quot;0&quot; cellspacing=&quot;0&quot; bordercolor=&quot;#c0c0c0&quot; cellpadding=&quot;5&quot; width=&quot;97%&quot; align=&quot;center&quot; bodercolorlight=&quot;#C0C0C0&quot;&gt;
            &lt;tbody&gt;
              &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Object name:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Capital repair of boiler unit and turbine of unit No.1&lt;/td&gt;&lt;/tr&gt;
            
              &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Form of participation:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;General contract&lt;/td&gt;&lt;/tr&gt;
            
              &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Client:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;SFTC Ukrinterenergo&lt;/td&gt;&lt;/tr&gt;
            
              &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Terms of project implementation 
                  &lt;br /&gt;
                (start - planned completion):&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;September 2009 - August 2010&lt;/td&gt;&lt;/tr&gt;
            &lt;/tbody&gt;
          &lt;/table&gt;
          
          &lt;p&gt; Project provides for general overhaul of boiler unit and turbine of Kalushskaya TPP station No.1. &lt;/p&gt;
        
          &lt;p align=&quot;justify&quot;&gt;  Scope of construction complexes:&lt;/p&gt;
        
          &lt;ul&gt;
            &lt;li align=&quot;justify&quot;&gt;        Station No.1 boiler unit; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;        Station No.1 boiler unit dust-system; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;        Station No.1 turbine; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;        Fuel conveying system; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;        Repair of station No.2 coupling transformer; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;        Ash dumps; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;        Repair of &lt;a href=&quot;http://www.multitran.ru/c/m.exe?t=2908269_2_1&quot; align=&quot;justify&quot;&gt;&lt;/a&gt;chemical water treatment plant. &lt;/li&gt;
          &lt;/ul&gt;
        
          &lt;p align=&quot;justify&quot;&gt;Object capacity:&lt;/p&gt;
        
          &lt;ul&gt;
            &lt;li align=&quot;justify&quot;&gt;         TPP rated capacity - 200 MW; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;         Station No.1 boiler unit TP-87 steam capacity  420 tonnes/h; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;         Station No.1 turbine PT-50-130-13/1,2 with nominal capacity 50 MW. &lt;/li&gt;
          &lt;/ul&gt;
        
          &lt;p align=&quot;justify&quot;&gt;Work scope:&lt;/p&gt;
        
          &lt;ul&gt;
            &lt;li align=&quot;justify&quot;&gt;       Manufacture and replacement of boiler elements 524 tonnes; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;       Repair of dust-system equipment 24 units; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;       Repair of PT-50-130 turbine - 1 unit; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;       Repair of coupling transformer - 1 unit; &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;       Repair of conveyers - 10 units (total length -1120 m); &lt;/li&gt;
          
            &lt;li align=&quot;justify&quot;&gt;       Replacement of piping -73 tonnes. &lt;/li&gt;
          &lt;/ul&gt;
        
          &lt;p align=&quot;justify&quot;&gt;Through the implementation of the project will be carried out a part of works on reconstruction and expansion of State Foreign Trade Company  &amp;quot;Ukrinterenergo&amp;quot; Kalushskaya TPP, including conversion of TPP from gas to &lt;a title=&quot;Техника&quot; href=&quot;http://www.multitran.ru/c/m.exe?a=110&amp;amp;t=592894_2_1&amp;amp;sc=28&quot; align=&quot;justify&quot;&gt;&lt;/a&gt;solid fuel combustion.&lt;/p&gt;
        &lt;/td&gt;&lt;/tr&gt;
    
      &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
    &lt;/tbody&gt;
  &lt;/table&gt;
&lt;/p&gt;
</description>
			<enclosure url="http://www.utem-group.com/upload/iblock/9b8/Kalush.jpg" length="5364" type="image/jpeg"/>
				<pubDate>Sun, 05 Sep 2010 01:20:52 +0300</pubDate>
</item>
<item>
	<title>Site preparation for construction of New Safety Confinement (NSC) at Chernobyl NPP</title>
	<link>http://www.utem-group.com/en/projects/354/</link>
	<description>
&lt;table border=&quot;0&quot; cellspacing=&quot;0&quot; bordercolor=&quot;#c0c0c0&quot; cellpadding=&quot;5&quot; width=&quot;97%&quot; align=&quot;center&quot; bodercolorlight=&quot;#C0C0C0&quot;&gt;
  &lt;tbody&gt;
    &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;Name:&lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;ChNPP &amp;quot;Shelter&amp;quot; Object&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;Form of participation:&lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;General Contract &lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;Customer:&lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;SSE Chernobyl NPP &lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;Sponsoring agency:&lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;EBRD&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;
        &lt;p&gt;Terms of project implementation (start &amp;ndash; planned completion):&lt;/p&gt;
      &lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;April 2008 - August 2010&lt;/td&gt;&lt;/tr&gt;
  &lt;/tbody&gt;
&lt;/table&gt;

&lt;br /&gt;

&lt;p&gt;The project foresees the work execution on clearance and territory leveling, earthworks and excavation activities for foundations construction.&lt;/p&gt;

&lt;p&gt;&lt;a href=&quot;/images/tekushie_proekty/Ploshadka-NBK_big.jpg&quot; target=&quot;_blank&quot; &gt;&lt;img title=&quot;Zoom in&quot; border=&quot;0&quot; src=&quot;/images/tekushie_proekty/Ploshadka-NBK_small.jpg&quot; width=&quot;140&quot; height=&quot;105&quot; /&gt;&lt;/a&gt; &lt;a href=&quot;/images/tekushie_proekty/Ploshadka-NBK_big_2.jpg&quot; target=&quot;_blank&quot; &gt;&lt;img title=&quot;Zoom in&quot; border=&quot;0&quot; src=&quot;/images/tekushie_proekty/Ploshadka-NBK_small_2.jpg&quot; width=&quot;140&quot; height=&quot;105&quot; /&gt;&lt;/a&gt;&lt;/p&gt;
</description>
			<enclosure url="http://www.utem-group.com/upload/iblock/bac/Ploshadka-NBK_small.jpg" length="6919" type="image/jpeg"/>
				<pubDate>Sun, 05 Sep 2010 01:20:52 +0300</pubDate>
</item>
<item>
	<title>Construction and reconstruction of industrial objects at OJSC “Neftekhimik Prikarpattya&quot;</title>
	<link>http://www.utem-group.com/en/projects/353/</link>
	<description>
&lt;table class=&quot;bordertable&quot; border=&quot;0&quot; cellspacing=&quot;0&quot; bordercolor=&quot;#c0c0c0&quot; cellpadding=&quot;5&quot; width=&quot;97%&quot; align=&quot;center&quot; bodercolorlight=&quot;#C0C0C0&quot;&gt;
  &lt;tbody&gt;
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Name:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;&amp;quot;Construction and reconstruction of industrial objects at OJSC Neftekhimik Prikarpattya&amp;quot; (town of Nadvirna, Ivano-Frankivska region)&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Form of participation:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;General Contract&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Customer:&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;OJSC Neftekhimik Prikarpattya&amp;quot;&lt;/td&gt;&lt;/tr&gt;
  
    &lt;tr&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;Terms of project implementation 
        &lt;br /&gt;
      (beginning - planning termination):&lt;/td&gt;&lt;td class=&quot;10&quot; valign=&quot;top&quot;&gt;January 2008 - December 2012&lt;/td&gt;&lt;/tr&gt;
  &lt;/tbody&gt;
&lt;/table&gt;

&lt;br /&gt;

&lt;p&gt;The project foresees construction and reconstruction of new &lt;a href=&quot;http://www.multitran.ru/c/m.exe?t=974038_2_1&quot; align=&quot;justify&quot;&gt;&lt;/a&gt;processing units for oil and oil-products refinery. &lt;/p&gt;

&lt;p align=&quot;justify&quot;&gt;Scope of construction:&lt;/p&gt;

&lt;ul&gt;
  &lt;li align=&quot;justify&quot;&gt;         diesel fuel hydrotreater complex; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         isomerization complex; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         hydrocracking  complex; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         hydrogen generation unit; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         &lt;a title=&quot;Нефтеперерабатывающие заводы&quot; href=&quot;http://www.multitran.ru/c/m.exe?a=110&amp;amp;t=4198206_2_1&amp;amp;sc=671&quot; align=&quot;justify&quot;&gt;&lt;/a&gt;delayed coker; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         n aphtha h ydrotreater unit; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         expansion of &lt;a title=&quot;Нефть&quot; href=&quot;http://www.multitran.ru/c/m.exe?a=110&amp;amp;t=276151_2_1&amp;amp;sc=141&quot; align=&quot;justify&quot;&gt;&lt;/a&gt;tank battery; &lt;/li&gt;

  &lt;li align=&quot;justify&quot;&gt;         &lt;a href=&quot;http://www.multitran.ru/c/m.exe?t=3564756_2_1&quot; align=&quot;justify&quot;&gt;&lt;/a&gt;off-plot facilities. &lt;/li&gt;
&lt;/ul&gt;

&lt;p align=&quot;justify&quot;&gt;Through implementation of the Program, the Employer will get an up-to-date economic production complex for oil refining.&lt;/p&gt;

&lt;p align=&quot;justify&quot;&gt;&lt;a href=&quot;/images/tekushie_proekty/Naftohimik_big.jpg&quot; target=&quot;_blank&quot; &gt;&lt;img title=&quot;Zoom in&quot; border=&quot;0&quot; src=&quot;/images/tekushie_proekty/Naftohimik_small.jpg&quot; width=&quot;140&quot; height=&quot;105&quot; /&gt;&lt;/a&gt; &lt;a href=&quot;/images/tekushie_proekty/Naftohimik_big_2.jpg&quot; target=&quot;_blank&quot; &gt;&lt;img title=&quot;Zoom in&quot; border=&quot;0&quot; src=&quot;/images/tekushie_proekty/Naftohimik_small_2.jpg&quot; width=&quot;140&quot; height=&quot;105&quot; /&gt;&lt;/a&gt;&lt;/p&gt;
</description>
			<enclosure url="http://www.utem-group.com/upload/iblock/b62/Naftohimik_small.jpg" length="9806" type="image/jpeg"/>
				<pubDate>Sun, 05 Sep 2010 01:20:52 +0300</pubDate>
</item>
<item>
	<title>Construction of a power source for “Yalta-Inturist” hotel complex</title>
	<link>http://www.utem-group.com/en/projects/455/</link>
	<description>
&lt;div align=&quot;center&quot;&gt;
  &lt;table border=&quot;0&quot; cellspacing=&quot;0&quot; cellpadding=&quot;0&quot; width=&quot;97%&quot;&gt;
    &lt;tbody&gt;
      &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;Object name: &lt;/p&gt;
        &lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;Power source for &amp;ldquo;Yalta-Inturist&amp;rdquo; hotel complex &lt;/p&gt;
        &lt;/td&gt;&lt;/tr&gt;
    
      &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;Form of participation: &lt;/p&gt;
        &lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;Contract &lt;/p&gt;
        &lt;/td&gt;&lt;/tr&gt;
    
      &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;Client: &lt;/p&gt;
        &lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;ТОВ &amp;laquo;Unitech-Trayding&amp;raquo; &lt;/p&gt;
        &lt;/td&gt;&lt;/tr&gt;
    
      &lt;tr&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;Terms of project implementation 
            &lt;br /&gt;
          (start - planned completion): &lt;/p&gt;
        &lt;/td&gt;&lt;td valign=&quot;top&quot;&gt;
          &lt;p&gt;May 2010 - October 2010 &lt;/p&gt;
        &lt;/td&gt;&lt;/tr&gt;
    &lt;/tbody&gt;
  &lt;/table&gt;
&lt;/div&gt;

&lt;p&gt;Contract provides for rehabilitation of a boiler house of the “Yalta-Inturist” hotel complex. &lt;/p&gt;

&lt;p&gt;Scope of work: &lt;/p&gt;

&lt;ul type=&quot;disc&quot;&gt;
  &lt;li&gt;commissioning of 3 hot-water boilers (manufactured by LOOS) with unit capacity 3 MW; &lt;/li&gt;

  &lt;li&gt;construction of a new boiler house building; &lt;/li&gt;

  &lt;li&gt;erection of processing equipment; &lt;/li&gt;

  &lt;li&gt;works at the central heating station: installation of heat exchangers, pumps, piping, installation modern valves; &lt;/li&gt;

  &lt;li&gt;laying-out of a heating main; &lt;/li&gt;

  &lt;li&gt;erection of 3 smoke stacks. &lt;/li&gt;
&lt;/ul&gt;

&lt;p&gt;After project completion the Employer will have a self-contained power source, which will enable to cover all the hotel complex&amp;rsquo;s auxiliaries in heating and hot water supply. &lt;/p&gt;
</description>
			<enclosure url="http://www.utem-group.com/upload/iblock/ab8/yalta_small.jpg" length="5441" type="image/jpeg"/>
				<pubDate>Sun, 05 Sep 2010 01:20:52 +0300</pubDate>
</item>
</channel>
</rss>
